Profile Information

Private
112991
73 West Center Street Lee, MA 01238
8.4
150, Lots 64 and 64A
42.3101006 / -73.252794
1
Byrne, James
byrne.james@epa.gov
617-918-1389


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Berkshire Regional Planning Commission2B96110001MAAssessment2009
Berkshire Regional Planning Commission4B00A00805MABCRLF2022
Berkshire Regional Planning CommissionBF96177301MAAssessment2013
R1 TBA - Massachusetts (STAG Funded)n/aMATBA2004
Town of LeeBF00A00104MAAssessment2016
Town of LeeTR96175701MAArea-Wide Planning2013


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$15,000.0007/12/2017Town of LeeN
Phase I Environmental Assessment$7,000.0003/24/201005/28/2010Berkshire Regional Planning CommissionYFY11
Phase I Environmental Assessment$5,000.0007/12/2017Town of LeeN
Phase I Environmental Assessment$5,000.0010/07/201411/11/2014Berkshire Regional Planning CommissionN
Supplemental Assessment$14,400.0007/12/2017Town of LeeN
Supplemental Assessment$60,200.0007/12/2017Town of LeeN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $106,600.00
Leveraged Funding:
Total Funding: $106,600.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Lead
Petroleum Products
NOT Cleaned up
NOT Cleaned up
Building Materials
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 8.4
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Site consists of two parcels of land totaling approximately 8.4-acres, located in Lee, Massachusetts on the northeast side of West Center Street. The Site is located on both the northern and southern side of the Housatonic River, which traverses the Site from east to west. The southern parcel (Lot 64) is located on the south side of the Housatonic River and is approximately 6.0-acres in size. The southern parcel consists of the 166,408 square-foot footprint of a mill-style brick building, which varies from one to four stories (the �main� Site building), and the 6,600 square-foot footprint of a two-story mill-style brick building (the �secondary� Site building). Grassy/vegetated areas occupy the western, eastern, and northern sides of the southern parcel of the Site, and paved parking areas are located in the southwest and northeast portions of the Site. The main Site building was constructed in the early- to mid-1800s and was historically used for manufacturing of paper products from its construction until approximately 2008. Beating, bleaching, and finishing of paper took place in the main Site building, in addition to the storage of associated hazardous materials, petroleum, and coal products used during paper production. Renovations/additions of portions of the main Site building were constructed in 1980. The main Site building is currently vacant. The secondary Site building, located in the southwestern portion of the southern parcel of the Site, was historically utilized as a carpenter�s shop, blacksmith, and machine shop between at least 1884 and 1964. The secondary Site building is currently used as rental space by a furniture maker and a collector of car parts. The northern parcel (Lot 64A) is located on the north side of the Housatonic River and is approximately 2.4-acres in size. The northern parcel consists of undeveloped forested land.
Industry (8.4)
ID Number (if Applicable): 1-0020494 Enrolled: 03/19/2018


Top of Page