Profile Information

Government
170002
Polk Street Bangor, ME 04401
2.8
Map 001 Lot 487
44.8131428 / -68.8202468
2
McKeown, Amy
McKeown.AmyJean@epa.gov
617-918-1248


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Bangor, City ofBF96188601MEAssessment2014
Eastern Maine Development Corp.BF96177401MEAssessment2013
Maine Department of Economic and Community DevelopmentBF96135501MEBCRLF2010
Maine Department of Environmental ProtectionRP96173701MESection 128(a) State/Tribal2013
Maine Department of Environmental Protection RP96185901MESection 128(a) State/Tribal2014


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$5,136.0002/25/201604/15/2016Bangor, City ofN
Cleanup Planning$4,900.0010/31/201412/03/2014Eastern Maine Development Corp.N
Phase I Environmental Assessment$3,955.0001/28/201403/27/2014Eastern Maine Development Corp.YFY15
Phase II Environmental Assessment$14,765.0007/11/201410/30/2014Eastern Maine Development Corp.N
Phase II Environmental Assessment$2,552.0003/28/201407/10/2014Eastern Maine Development Corp.N
Phase II Environmental Assessment$39,904.0002/25/201503/02/2016Bangor, City ofN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $71,212.00
Leveraged Funding:
Total Funding: $71,212.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Asbestos
Cadmium (Cd)
Chromium (Cr)
Copper (Cu)
Lead
Mercury
Other Metals
PCBS
Selenium (Se)
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Building Materials
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
12/05/201404/05/2016Maine Department of Economic and Community DevelopmentNo
12/05/2014$103,500.0004/05/2016Maine Department of Economic and Community DevelopmentNo
12/08/2014$155,704.00Maine Department of Environmental Protection


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 2.8
Number of Cleanup Jobs Leveraged: 0
EPA Cleanup Funding: $259,204.00
Leveraged Funding: $25,000.00
Cost Share Funding:
Total Funding: $284,204.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls
Restricted use of groundwater from off-site adjoining source area. Property being leased by responsible party.
Yes
No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
10/01/2015$290,000.00Bangor, City of09/01/2016
10/01/2015$45,615.00Bangor, City of09/01/2016
10/01/2015$4,395,401.00Bangor, City of09/01/2016


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Site was first developed in 1927 as part of Godfrey Field, a civilian airport, until it became part of the Dow Army Airfield in 1942, and the Dow Air Force Base in 1947. Based on a previous Phase I ESA, the vicinity of the Site was originally in an area of several runways and/or helicopter pads or hangars until the current Site building was constructed in 1957. According to plans for the Site, an addition was added to the Site building in approximately 1961. Light developed subsequently occurred in the vicinity of the Site; however, conditions in the area appear generally unchanged from 1973 through the present. Based on the previous Phase I ESA and Maine Department of Environmental Protection records for the Site and vicinity, there are numerous potential sources of contaminants that may have impacted environmental media at the Site. Former Use: The Site is a 2.8-acre parcel located on the corner of Polk Street and Nevada Avenue to the east of BIA?s runway. The Site contains a one story slab on grade building that was constructed in approximately 1957 and an addition was added to the northwest side of the building in approximately 1961. Due to a leaking roof and lack of maintenance throughout the building, the building is in severe disrepair and has experienced considerable water damage. According to plans obtained from the City of Bangor Planning Department, the original portion of the Site building contained squadron operations and target intelligence office space associated with the Dow Air Force Base. The new addition on the northwest side of the building in 1961 contained a trainer room and simulator room. According to the 1982 Site plans, the addition was used as a Non Destructive Inspection (NDI) Laboratory. The addition contained a garage bay, lead-lined X-ray room, and small X-ray processing rooms. The original portion of the building was occupied by administrative office space. The building was given to the City of Bangor ion 1995 and was abandoned in 1996 and has remained vacant since that time.
Industry (2.8)
Hazardous
ID Number (if Applicable): REM02312 Enrolled: 11/23/2015
04/05/2016