237374
196 1/2 E. 6th Street SIOUX FALLS, SD 57103
10.75
012216178001000
43.5514505 / -96.7163734
1
Wilson, Christina
Wilson.Christina@epa.gov
303-312-6706


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of Sioux FallsBF96835801SDAssessment2015


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Supplemental Assessment$15,130.0010/29/201801/29/2019City of Sioux FallsYFY19


Is Cleanup Necessary? Yes
EPA Assessment Funding: $15,130.00
Leveraged Funding:
Total Funding: $15,130.00


Top of Page


Contaminants and Media


Asbestos
Lead
NOT Cleaned up
NOT Cleaned up
Building Materials
Air
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 10.75
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Institutional and Engineering Controls

No
Yes
Other SSD system is in place


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Additional Property Attributes

Former Use: The Sioux Steel Company, formerly the Sioux Falls Corrugating Company, operates at the Site. The Site was first developed in approximately 1890 with a quarry near the central portion of the Site. Approximately three structures existed on-site during the period from 1891 until 1896. A warehouse with a rail platform was added in approximately 1911 near the southwest corner of the Site (the original portion of the main building may consist of this warehouse). The river channel on-site was filled sometime between 1916 and 1924. According to the County Assessor, the original portion of the main building was constructed in 1920. The on-site quarry was filled sometime between 1952 and 1958. Many additions were added to the main building over the years. The plastics building was constructed on-site sometime between 1985 and 1990. The facility is currently an active manufacturer of grain bins, buildings, livestock equipment and garden beds.
Industry (10.75)
Hazardous